Go directly to the responsible authority
Use the controlling documents for the installation and service area. This guide brings the references together; it does not replace the standards or an installation-specific assessment.
Current operational references for installers and retailers working across WA solar, battery storage and distributed energy connections.
Industry, Installers, Partners
Compliance obligations can arise from electrical licensing, Australian Standards, network operators, retailers, the Small-scale Renewable Energy Scheme and state program terms. Current primary sources should be checked before work begins.
Separate electrical licensing, network connection, retailer functionality, product approval, accreditation and incentive requirements. They are administered by different bodies.
Confirm the electrical licence, contractor arrangements and Solar Accreditation Australia endorsement required for the design, installation and supervision model.
Confirm battery and inverter status against current approved and supported lists. Scheme participation may require more than general product approval.
Use the connection requirements, standards, manufacturer instructions and site conditions applying on the installation date. Do not rely on a superseded saved copy without checking the source page.
Verify grid response, export control, backup behaviour, communications and required inverter modes before handover.
Keep certificates, photographs, serial numbers, settings, approvals, customer declarations and commissioning results in a form that can be audited.
Use the controlling documents for the installation and service area. This guide brings the references together; it does not replace the standards or an installation-specific assessment.
Current federal and WA scheme guidance requires appropriately licensed and accredited personnel. The exact licence, Solar Accreditation Australia endorsement and supervision requirements should be checked for the installation type and service area.
Network, scheme and evidence requirements can change. The controlling source page should be checked for the current document and effective date before design, quoting and commissioning decisions are finalised.
No. A product may need to satisfy Clean Energy Council approval, a network or retailer supported list, system compatibility and the other requirements of the specific program.
The Clean Energy Regulator warns that missing photo evidence can cause certificate claims to fail. State program, network and electrical records can have separate consequences and retention requirements.
Contact McKercher Corporation with the licensing, scheme or network requirement in question and the installation type it relates to.
Contact McKercher Corporation for corporate, regulatory or operational enquiries relating to the group.
Raise a compliance enquirySupporting references for electrical safety, scheme evidence and network connection, grouped for the task at hand.


