Confirm the requirements for the whole installation
Review network requirements alongside product and program eligibility. A suitable battery and a supported complete installation are different checks.
A structured starting point for WA property owners and installers assessing retrofit compatibility, connection requirements, rebates and commissioning.
Customers, Installers
Begin with the existing installation, not the battery catalogue. Since 1 May 2026, adding a battery in the South-West Interconnected System is assessed as an upgrade of the whole installation: the existing solar system is checked against current connection requirements alongside the new equipment, and the outcome can change the viable design.
Identify the solar inverter, panel array, switchboard condition, metering arrangement, network settings and any existing export limit before selecting a battery architecture.
Compare daytime generation, evening consumption, seasonal demand and intended backup loads. Rebate ceilings do not establish the appropriate battery size for a property.
Check the battery, inverter, gateway, firmware and communications requirements as one system. Existing equipment may need reconfiguration or additional hardware.
Confirm whether Western Power or Horizon Power requirements apply, then check the retailer functionality settings and supported product lists relevant to the site. An addition is assessed as an upgrade of the whole installation under the requirements commencing 1 May 2026, so a design that keeps the existing inverter must be confirmed as a supported configuration before it is quoted.
Federal certificates, the WA scheme, vendor accreditation and virtual power plant participation have distinct requirements. Eligibility should be confirmed before a contract relies on an incentive.
Allow for testing, electrical certification, photographs, serial numbers, customer documents and registration steps before installation work begins.
Often, yes. The WA scheme recognises additions to existing solar, but the viable design depends on the inverter, network connection, supported equipment and virtual power plant requirements. Some sites require a gateway, reconfiguration or replacement equipment.
The Clean Energy Regulator states that an existing solar PV system paired with a new eligible battery must comply with electrical safety requirements, but the existing PV equipment does not need to appear on the current Clean Energy Council approved list.
Current Clean Energy Regulator guidance sets a nominal capacity range of 5 to 100 kWh, with certificates applying to the first 50 kWh of usable capacity. Eligibility is assessed under the rules applying to the installation and claim.
Yes. Under the WA connection requirements commencing 1 May 2026, an addition brings the entire installation under assessment against current requirements, not just the new equipment. Depending on the existing inverter and configuration, that can mean reconfiguration, additional compliance equipment, or migrating the existing panels onto a new inverter rather than retaining the old one.
No. Consumption timing, export, future loads and backup priorities should shape the design before a specific capacity or product is selected.
Review network requirements alongside product and program eligibility. A suitable battery and a supported complete installation are different checks.
Contact PSW Energy or Perth Solar Warehouse with the existing inverter brand and model, approximate installation age and current export limit.
PSW Energy and Perth Solar Warehouse assess solar and battery requirements across Western Australia.
Discuss a battery retrofitFurther reading follows the assessment: existing equipment, connection and program settings, then safety and records.